复合材料科学与工程 ›› 2020, Vol. 0 ›› Issue (4): 79-83.

• 应用研究 • 上一篇    下一篇

从传热角度评估复合绝缘支柱芯体热机试验温升时间合理性

邢照亮1, 张卓1, 袁金2*, 赵卫生2   

  1. 1.全球能源互联网研究院有限公司先进输电技术国家重点实验室,北京102209;
    2.北玻电力复合材料有限公司,枣庄277500
  • 收稿日期:2019-08-05 出版日期:2020-04-28 发布日期:2020-04-28
  • 通讯作者: 袁金(1995-),男,学士,助理工程师,主要从事特高压复合支柱绝缘子内绝缘材料、复合绝缘横担工艺等方面的研究,18310621605@163.com。
  • 作者简介:邢照亮(1988-),男,硕士,高级工程师,主要从事电工绝缘材料研发和高压绝缘技术方面的研究。
  • 基金资助:
    国家电网公司科技项目(SGRIDGKJ[2017]607);国网浙江省电力有限公司项目(SGZJWZYJYJJS1800141)

EVALUATING THE REASONABLE TEMPERATURE RISE TIME OF COMPOSITE INSULATIONPILLAR CORE HEAT ENGINE TEST FROM THE PERSPECTIVE OF HEAT TRANSFER

XING Zhao-liang1, ZHANG Zhuo1, YUAN Jin2*, ZHAO Wei-sheng2   

  1. 1.State Key Laboratory of Advanced Power Transmission Technology, Global EnergyInterconnection Research Institute Co., Ltd., Beijing 102209, China;
    2.BeiBo Electric Power Cmposite Materials Co., Ltd., Zaozhuang 277500, China
  • Received:2019-08-05 Online:2020-04-28 Published:2020-04-28

摘要: 随着特高压应用的复合支柱绝缘子用芯体直径不断增大,现有标准中热机试验的温升保持时间合理性值得讨论。本文通过等效模拟热量在复合材料中的传递形式,估算复合绝缘支柱芯体的导热系数。以有限元模拟方法,用ANSYS软件建立复合绝缘支柱芯体的数学模型,输入估算的导热系数及热机试验环境条件,模拟支柱芯体内部温度变化过程。设定型式试验,通过在支柱芯体内部不同厚度位置设置监测点,实时记录均匀受热状态下芯体内部温度随时间的变化曲线。试验表明支柱芯体内部完全达到(50±5) ℃需62800 s,远大于热机试验时间43200 s,现有试验方法存在缺陷。仿真模拟与产品实际温升误差值分别为6.2687%、6.5026%、5.5696%,仿真模拟结果较为准确。

关键词: 复合绝缘支柱芯体, 特高压, 导热系数, 有限元模拟, 热机试验, 复合材料

Abstract: As the diameter of the core of the composite post insulator for UHV applications continues to increase, the rationality of the temperature rise retention time of the existing standard heat engine test is worth discussing. In this paper, the thermal conductivity of the composite insulating pillar core is estimated by equivalently simulating the heat transfer pattern in the composite. Using the finite element simulation method, the mathematical model of the composite insulating pillar core was established by ANSYS software, and the estimated thermal conductivity and thermal test environment conditions were input to simulate the internal temperature change process of the pillar core. We set the type test, set the monitoring point in different thickness positions inside the pillar core, and record the curve of the internal temperature of the core with time under the uniform heating state in real time. The test result shows that the internal height of the pillar core reaches (50±5) ℃, which is 62800 s, which is much larger than the thermal test time of 43200 s. The existing test methods have defects. The simulation temperature and the actual temperature rise error of the product are 6.2687%, 6.5026%, and 5.5696%, respectively. The simulation results are of good accuracy.

Key words: composite insulating pillar, UHV, thermal conductivity, finite element simulation method, the heatengine test, composite

中图分类号: